LMB 365 – Day 250

Day 250 of #LMB365 shows a recent repair to the LMB’s fire hydrant ring main that sprung a leak. The soil had to be excavated to expose the leak on a brass fitting. This was repaired by contractors working with the LMB’s Estates and Facilities team.